Partial expansion of Bünz, Wohlen (AG)

Flood protection for the town of Wohlen was ensured with the construction of a retention basin and a partial expansion of the Bünz. The partial expansion included the construction and raising of various bridges as well as various bank protection measures.

Back to overview

Client
  • Kanton Aargau
Services
  • Bridge engineering
  • Flood protection and renaturation
  • Hydraulic engineering

Contact

Contact form

More projects