Energy Production and Distribution
Design & assessment of overhead lines with PLS-CADD & Tower
Gruner provides engineering services for all aspects of energy transmission facility design using PLS-CADD. With this software, our engineers and designers are able to manage large-scale power transmission line projects. PLS-CADD program is the world leader in the development, design and maintenance of overhead transmission lines from 35 to 750 kV. PLS-CADD is a 3D environment for modeling of Over-Head Lines (OHL) allowing us to use any georeferenced data, including LiDAR, photogrammetry, maps, etc.
PLS CADD
PLS-CADD allows you to create an overhead line model that will look “as built”. Engineering analysis based on PLS-CADD will allow you to increase the line reliability or increase the power transmission capacity. In many cases this will allow both.
Tower
In the study of electric towers, we use TOWER for modeling and calculations of existing or new towers. We offer expertise in assessing existing structures, conducting obsolescence studies, and analyzing corrosion. We also specialize in tower reinforcement and modification, as well as underground and aerial transition towers. Our services include the supervision of these works.
Furthermore, we focus on the optimization and improvement of OHL reliability. We provide modeling and 2D/3D drafting of OHL and towers, along with the analysis and design of tower foundations. Our comprehensive services extend to logistics and supply management, planning, and works supervision until commissioning.
Our extensive experience and comprehensive range of services ensure the successful execution and optimization of your transmission line projects.