New Solid Launch Facility Novartis, Stein

The pharmaceutical building with a floor area of 80 x 165 m2 has five above-ground and two underground floors (25m high, 5m to 9m deep). The building is divided into four sections:

Galenic: laboratories, production, engineering. Construction of pre-stressed precast girders and slabs on composite columns with suspended intermediate floors of steel.

Packaging: packaging and storage - steel construction with 41m span.

Support: Offices, laboratories, logistics made of in-situ concrete with precast columns.

Plantrooms: 3600 m2 steel construction hall on the roof for technical facilities.

Back to overview

Building Contractor
  • Novartis Pharma AG
Client
  • ARGE Burckhardt & Partner, Koppenhöfer + Partner
Architect
  • Burckhardt und Partner AG
Services
  • Structural engineering

Contact

More projects