With the expansion of the warehouse, production halls, offices and parking garage, Waldstatt is becoming an attractive place to work. Due to the high payloads (2000 kg/m2) of the production, as well as the combination of in-situ concrete and prefabricated concrete elements, precise planning and execution is required.
Innovation
- Combination of in-situ concrete and precast concrete elements
- Top floor executed as steel construction
- High payload through production (2000 kg/m2)
- Securing of excavation pits with net-reinforced seepage concrete, seepage concrete discs and nailing
- Underpinning of the existing building
- Groundwater lowering with Wellpoint system
- Foundation of the building with large bore piles
- retaining wall with compression and tension piles
Building Contractor
- Arcolor AG
Client
- Beat Oberhänsli Architektur AG
Architect
- Beat Oberhänsli Architektur AG
Services
- Structural engineering