Zwingen Birs

Various measures were planned and carried out on the Birs in Zwingen to enable fish passage and for flood protection: Lowering of the riverbed, reactivation of the former moat at Zwingen Castle (flood relief), flood embankment, replacement of a 3.5 m high drop with a block ramp and underpinning of the bank protection.

Back to overview

Client
  • Tiefbauamt Kanton Basel-Land
Services
  • Flood protection and renaturation
  • Hydraulic engineering

Contact

Contact form

More projects