Retention basin fire

As part of the Langete flood protection project, the Brand retention basin was built above the Rohrbach settlement area. The following elements were part of the flood protection project: retention basin (volume 120,000 m3), concrete barrier as final structure (length 44m, max. height 10m), throttle outlet, emergency outlet and stilling basin with counter sill and upstream alluvial rake made of steel, lateral earth dam, ecological upgrading of the channel above the barrier by a structured log set and deadwood installation. 

Back to overview

Client
  • Einwohnergemeinden Huttwil, Rohrbach und Madiswil
Services
  • Flood protection and renaturation
  • Hydraulic engineering

Contact

Contact form

More projects