In the course of the meliorations in the middle of the 20th century the Bibersee was drained and the Tobelbach was straightened in a channel secured with concrete slabs. With the renaturation project, the stream was renaturalized and the Bibersee was restored.
Client
- Kanton Zug
Services
- Flood protection and renaturation
- Hydraulic engineering