The water supply systems of Hausen and Kappel am Albis were merged. This was done with the construction of a new reservoir (850 m3) and the construction of around 6 km of new water pipes. The new Ebertswil reservoir also serves as a step pumping station. The pipeline construction required the trenchless underpassing of various streams. A DCS allows the control and monitoring of all existing and new structures in the four different pressure zones.
Client
- Gemeinde Hausen am Albis (ZH)
Services
- Municipal engineering
- Urban hydraulics and water drainage