In the meantime, the Eizmoos area is completely drained in the separate system. With the construction of a storm sewer line directly into the receiving waters of the Lorze River, the existing combined sewer line can now be converted into a pure wastewater line. The construction of the stormwater pipeline (DN 700) is being carried out using both conventional open trench construction (meadowland) and trenchless methods (forest, steep slope).
Client
- Gemeinde Cham
Services
- Municipal engineering
- Urban hydraulics and water drainage