The Services industriels Lausanne, SiL, are responsible for the heat supply of the eco-neighborhood Plaines-du-Loup. Gruner Gebäudetechnik Basel has been commissioned by SiL to design (Phases 31 - 53 according to SIA 108) the heat production plants of the building complexes C and D. The heat production plants comprise eight heating centers and two substations. The heat production plants comprise eight central heating stations and two substations:
- a total of eight low-temperature heat pumps for building heating, total capacity 1'100 kWth
- a total of eight high-temperature heat pumps for hot water production, total capacity 300 kWth
- two anergy networks, which draw geothermal energy from a total of 12x 800m deep geothermal probes with a total capacity of 624 kWth and supply it to the heat pumps as an energy source
- two systems for heat recovery from the building wastewater, which extract heat from the wastewater via two heat pumps with a total of 250 kWth and feed it back into the anergy network
The ensemble of buildings with heating systems complies with the standards Minergie P and the 2000 W Society.
Client
- Services industriels de Lausanne (SiL)
Processing period
- 2018 - 2024
Services
- Energy systems design and technology