Railroad axis Brenner

Safety planning for the northern approach of the Berlin-Palermo high-speed railway line

The high-speed rail line from Berlin to Palermo is the European Union's No. 1 TEN project (TEN: Trans-European Networks). The new Lower Inn Valley Railway relieves the already heavily used section on the northern approach to the Brenner Base Tunnel.

Services

Safety and security design for the approx. 40 km northern approach section (Kundl/Radfeld-Baumkirchen section) of the Brenner rail axis with the two tunnel structures Terfnertunnel and Münsterertunnel totaling 34.5 km in length, preparation of labeling concept and tunnel safety documentation as well as execution of training courses and exercises with up to 1000 participants.

Back to overview

Client
  • ÖBB Infrastruktur AG
Services
  • Infrastructure safety

Contact

Contact form

More projects