The Beausite overpass is a pre-stressed concrete bridge over the N09 freeway with a length of 40m, a width of 13m and a height of apprximately 8m. It consists of a hollow-core concrete slab composed of 2 spans. The static verifications were conducted by Gruner Stucky Ltd. The works carried out were:
- Campaign of field investigations to determine the condition of the structure
- Hydrodemolition and reconstruction of new reinforced concrete curbs
- Reinforcement of the deck at the cantilever
- Replacement of guardrails and railings
- Replacement of pavement joints
- Rehabilitation of the degraded concrete of the deck, abutments and central pier
- Repair of the supports
- Replacement of the waterproofing and the bituminous coating with mastic asphalt
One half of the bridge was kept in operation during the works.
Client
- ASTRA - OFROU - FEDRO
Processing period
- 2016 - 2020